Home
Launches
Payloads
Cores
Rockets
Ships
Launch Pads

Flight #64 – 6/29/2018, 9:42:00 AM
Success: Yes
Upcoming: No
TBD: No
NET (No Earlier Than): No
Static Fire Date: 6/23/2018, 9:30:00 PM
Payload included MISSE-FF 2, ECOSTRESS, and a Latching End Effector. The refurbished booster featured a record 2.5 months period turnaround from its original launch of the TESS satellite — the fastest previous was 4.5 months. This was the last commercial flight of a Block 4 booster, which was expended into the Atlantic without landing legs and grid fins.